how aggregate duraration and sum it in timetable
Hi,
it’s a timetable and i want to sum all duration equal:
example:
04/01/2010 2202 1.23
05/01/2010 2202 1.26
……
i want this:
duration value
22:02 2.49 (1.23+1.26)Hi,
it’s a timetable and i want to sum all duration equal:
example:
04/01/2010 2202 1.23
05/01/2010 2202 1.26
……
i want this:
duration value
22:02 2.49 (1.23+1.26) Hi,
it’s a timetable and i want to sum all duration equal:
example:
04/01/2010 2202 1.23
05/01/2010 2202 1.26
……
i want this:
duration value
22:02 2.49 (1.23+1.26) how aggregate duraration and sum it in timetable MATLAB Answers — New Questions