Simscape AC Current Source issue
Hello Community,
I would like to simulate a street with Simscape, and i wanted to use a AC current source to supply from residents. As i learned it is the same issue with the simple AC Voltage Source, that even i use 3 phase breaker at both side, and wswitehced off, during the simulatin the status of the breaker is not relevant.
This is the subsystem is use:
There is the two 3 phase breaker (I iknow it is not necessary, but i dont have other idea), what is by default closed.
When i make a simulation with both breaker open status:
The value of the current is added even it is switched off. This should be the values, when the breakers are open ( i delete the 3 AC cource):
Every section i made an option to break the line, so i did it to see, and the result is, that even the breakers are in open position, it is still count:
Other, that i tried with closed breakers, and nothing change, therefore i think is is an issue with the calculation.
Do anybody have any idea what is goint on?
Thanks.
PS: The model works more less with the controlled AC source, but it is changing even i set the designated AC Current, SO therefore i would like to try another source.Hello Community,
I would like to simulate a street with Simscape, and i wanted to use a AC current source to supply from residents. As i learned it is the same issue with the simple AC Voltage Source, that even i use 3 phase breaker at both side, and wswitehced off, during the simulatin the status of the breaker is not relevant.
This is the subsystem is use:
There is the two 3 phase breaker (I iknow it is not necessary, but i dont have other idea), what is by default closed.
When i make a simulation with both breaker open status:
The value of the current is added even it is switched off. This should be the values, when the breakers are open ( i delete the 3 AC cource):
Every section i made an option to break the line, so i did it to see, and the result is, that even the breakers are in open position, it is still count:
Other, that i tried with closed breakers, and nothing change, therefore i think is is an issue with the calculation.
Do anybody have any idea what is goint on?
Thanks.
PS: The model works more less with the controlled AC source, but it is changing even i set the designated AC Current, SO therefore i would like to try another source. Hello Community,
I would like to simulate a street with Simscape, and i wanted to use a AC current source to supply from residents. As i learned it is the same issue with the simple AC Voltage Source, that even i use 3 phase breaker at both side, and wswitehced off, during the simulatin the status of the breaker is not relevant.
This is the subsystem is use:
There is the two 3 phase breaker (I iknow it is not necessary, but i dont have other idea), what is by default closed.
When i make a simulation with both breaker open status:
The value of the current is added even it is switched off. This should be the values, when the breakers are open ( i delete the 3 AC cource):
Every section i made an option to break the line, so i did it to see, and the result is, that even the breakers are in open position, it is still count:
Other, that i tried with closed breakers, and nothing change, therefore i think is is an issue with the calculation.
Do anybody have any idea what is goint on?
Thanks.
PS: The model works more less with the controlled AC source, but it is changing even i set the designated AC Current, SO therefore i would like to try another source. simscape, specialized power systems MATLAB Answers — New Questions