resource over allocation in a Master Project
I’m working with Master Project, and some Sub projects.
Let’s say Jack, is allocated at the same dates to tasks in different subproject, and at the same time to a task of the Master project.
I do use the “resource Pool” and also assign “Share resources”. But this enables only to look at over allocation between Master Project and one of the Sub Projects.
Is there a way to see over allocation between all the sub projects, as an aggregated summary and red indication?
I’m working with Master Project, and some Sub projects. Let’s say Jack, is allocated at the same dates to tasks in different subproject, and at the same time to a task of the Master project.I do use the “resource Pool” and also assign “Share resources”. But this enables only to look at over allocation between Master Project and one of the Sub Projects.Is there a way to see over allocation between all the sub projects, as an aggregated summary and red indication? Read More